All Rights Reserved The 65-km PRR will complete the portion of NICE Road — between Tumakuru Road and Hosur Road — to make it a full circle. British in Hosur Actually, Hosur Road is not Hosur ring road. Synopsis The entire STRR project involves a length of 367 km around Bengaluru that will connect the eight major satellite towns. In fact, it is a violation of the Disaster Management Act which forbids the arrangement of congregations.”

The project was announced by former Karnataka Chief Minister SM Krishna in the early 2000s, with the goal of limiting the entry of heavy vehicles. Mosque built by Tippu Sultan. Also, there will be less land that will have to be acquired, thereby reducing the project cost by about 40%. BENGALURU: The Urban Development Department (UDD) has chalked out a fouryear plan to implement the much-delayed Peripheral Ring Road (PRR) project. Since the plan is to link it to the NICE corridor, a seamless drive around the city will become a reality, instead of a dream.Because the Outer Ring Road is already very congested, movement of daily commuters has become quite difficult.The Peripheral Ring Road Bangalore will provide an alternative route to the commuters to reach the north side of the city from Traits of Bengaluru real estate is improving as some of the real estate hubs in the market are showing attractive returns when compared to other cities.Earlier, BDA had claimed that land acquisition would be done for a total of 1,920 acres for Phase I (width- 100 meters). The total length of the ring road is 12 kms

In their letter, CfB said, “The BDA changed the alignment of the Peripheral Ring Road, hence rendering it a new project as per Karnataka Town & Country Planning Act. Incidentally, the KSPCB is also holding a public consultation meeting on August 18 for the 65-km 8-lane roadways project connecting Tumakuru Road with Hosur Road, based on the same EIA report. Of this, NHAI will build 240-km expressway. An elevated corridor will lead to multiple benefits.

The Draft Environmental Impact Assessment for the Peripheral Ring Road connecting Tumakuru Road and Hosur Road in Bengaluru revealed that the project requires the removal of 33,838 trees. The project … “We received approval from the state Cabinet last week.
The balance 25 meters would be kept for commercial developments and other essential amenities like electricity and water.Phase I of PRR will integrate many national and state highways around Bengaluru like the Tumkur Road, Old Madras Road, Bellary Road, and Hosur Road.

Over the next three years, the government will fund the whole project in phases,” CM Kumaraswamy said on Tuesday.The Chief Minister said that in the budgetary allocation during the next fiscal, the government would set aside Rs 4,500 crore for the project.

Currently, the government is planning to make it an elevated highway. Technical proposals will be sought in the first week of November to finalize the bidders.The project will provide seamless connectivity between Tumakuru and Hosur Road passing via Ballari Road and Old Madras Road. The commuters will have easier transits with 20 lanes (10 above and 10 below). The long-awaited 66km Peripheral Ring Road (PRR) project, connecting Hosur Road and Tumakuru Road, has gathered some momentum due to a push from the Government. For reprint rights: Four-year plan to implement 65-km peripheral ring road in BengaluruBangalore's peripheral ring road will be an elevated corridorBids for 65-km peripheral ring road in a month: HD KumaraswamyGovernment may seek bigwigs' support for 65-km peripheral ring road projectNitin Gadkari makes an offer for Bengaluru's peripheral ring road that Karnataka cannot refuseFate of Peripheral Ring Road plan to be decided by CM Siddaramaiah in the state budgetWith Nitin Gadkari on board, it could be a smooth drive on Bengaluru's peripheral ring road project The road project was proposed during 1986 and got completed in 2010. As the Outer Ring Road is already facing congestion, movement of daily commuters has become tough. The idea of a concentric road named “Peripheral Ring Road” in order to decongest the city, germinated as the city started expanding beyond the ORR. Depending on the vehicle you choose, you can also calculate the amount of CO2 emissions from your vehicle and assess the environment impact. Choose your reason below and click on the Report button. Incidentally, the KSPCB is also holding a public consultation meeting on August 18 for the 65-km 8-lane roadways project connecting Tumakuru Road with Hosur Road, based on … They have asked for a fresh scheme, which includes a new proposal, feasibility studies, alternatives and fresh budget approvals and public hearings, from authorities. The Phase 1 was restricted to 65 km only. The Bangalore Development Authority (BDA) on Sunday floated a tender to hire consultants to come on board for preparing a feasibility report as well as a detailed project report.The project aims to divert heavy vehicles entering Bangalore city, and it will be an elevated corridor in its new avatar. Now the estimated cost of the project has gone up by more than four times,” he added.Over the years, the project has been pending as the Bengaluru Development Authority and the National Highways Authority of India have been passing the buck to each other regarding land acquisition.The project has also undergone various changes since its original plan, where several farmers were to lose their lands.
The Karnataka State Pollution Control Board has called for a public hearing on the project on August 18.The Citizens for Bengaluru (CfB) has written to the Karnataka State Pollution Control Board (KSPCB) to scrap the Environment Impact Assessment (EIA) report for the Peripheral Ring Road (PRR) project, claiming that it was no longer legally valid. Revised Master Plan 2031: Two new Ring Roads, metro routes. It is at that stage that a new EIA is to be drafted, as per the Karnataka Town & Country Planning Act, Section 14(A).”It added, “The utility of public projects must be determined as specified by law, through the course of due process with its concomitant safeguards, and issues affecting the people of Bengaluru resolved before commencement.