This is in conjunction with the 76th street widening project. Dixboro Road will be paved between 8 Mile Road and 9 Mile Road in Lyon Township.Bridge preventative maintenance project will take place on Grand River Avenue over the CSX railroad in Novi in 2020. After placing the temporary paving throughout the project, construction work will begin on the East Segment. List of replacement/rebuild projects in Southeast Michigan: Bonding program projects in SE Michigan.

Ada Drive from Forest Hill Avenue to 500' west of Alta Dale Avenue will have closures for sewer work. 2020 Road Construction Project List. Road construction is expected to begin in the spring of 2021. The Maple/Middlebelt Road intersection will be completely reconstructed in 2019 with plans to build a roundabout. Removal and replacement of existing railroad crossing across Fruit Ridge.This list includes the list of local road improvements in Courtland that are typically cost-shared between KCRC and the township. Smaller projects can be found in the following sections: concrete slab replacement, crack sealing, preservation overlays and spot resurfacing program. Construction on state and interstate highways and trunklines is within the jurisdiction of the Michigan Department of Transportation (MDOT), not the Kent County Road Commission. *Project categories on this map include Repair and Rebuild Roads, Bridge Replacement and Rehabilitation, Big Bridge, Trunkline Modernization, Capacity Improvement, and New Roads. Culvert replacement on Square Lake Road over the Amy Drain in Bloomfield Township.Subdivision road improvements in townships are done through a process called Special Assessment District (SAD). Work will include course crushing, shaping, and resurfacing, earthwork, drainage and restoration.Modify and upgrade existing traffic signal, with box span configuration, LED signal heads, backplates and updated detection.The mill and fill project includes cold-milling the existing asphalt 5 inches deep in the 5-lane section of 76th Street and 1.5 inches deep in the 4-lane portion and placing new asphalt paving and pavement markings. Each road project continues to evolve, and the project list could change. KCRC recently had the opportunity to modify its federal aid improvement plan which will allow all of the 13 Mile Road work to be completed in 2021. This process is used when a surface has deteriorated to poor condition and surrounding grades (i.e. Local roads are generally shorter distance, two-lane collector roads and residential streets.

Major projects are listed in alphabetical order. Ada Drive from Spaulding Avenue to Fox Hollow Avenue has eastbound traffic closure for sewer work. RCOC is planning concrete slab replacement on several roads throughout Oakland County in 2020.Culvert replacement on Cooley Lake Road over Lake Sherwood in Commerce Township.This is the project page for the Currie Road ProjectCulvert Replacement on Davisburg Road over the Garner Drain in Springfield TownshipDequindre Road from West Utica Road to north Auburn Road in Rochester Hills and Shelby Township will be widened from two lanes to five lanes in 2020. Work will be conducted under lane closures; traffic maintained.The southbound right turn lane of 84th Street north of Division Avenue will be closed for concrete work. Mississippi Department of Transportation website for agency related information. Initially, the contractor will place temporary paving on the north side of Knapp Street in order to maintain two-way traffic. Until then, KCRC will continue to provide routine maintenance to maintain safety on the road until the reconstruction project is complete.Gravel to pavement reconstruction.

Construction will begin at 10 Mile Road and proceed south towards 6 Mile Road.